The most difficult issue from a design perspective was developing a design which could be moved after five years and then reinstalled in sectional parts at other points on the campus…
As architects we mostly work for public or private clients and are not used to realize works in real public space. We were amazed on how many meetings we had to attend and how many people we…
There were many programmatic demands for the project, in just 2 ½ acres of space. We felt if we couldn’t deliver shade, for example, the space would be…
Speed of construction was the main challenge of the project. Particulary the design of the furnishing system required a lot of efforts, to reach an efficient and easy construction. We improved the tools that allow us to be…
In this project, the client had a fix wish of incorporating the whole shop space into the window display. Additionally, we wanted to create a space that would be eye-catching from the street…
The most difficult issue about working with this building was the integration of the sculpture. On this project I operated as lead designer in collaboration with McQueen himself and…
Actually, there is nothing new about amorphous-shaped houses, but the design process has changed dramatically. Special software for computer-supported design allows the generation of new building techniques that cause new social discussions…
The most challenging part of the project was to make it simultaneously a powerful architectural concept and to support the audience experience with the architecture.This can be quite complex with spaces that have large spans, such as a concert hall for six thousand people…